Residential  ·  New Construction

Your Radon Partner for New Home Builds

A proven testing and fan-install process built to keep your schedule moving — not slow it down.

★ 4.8 Rated
Homeowners & Builders
🏗️ Established Partners
Active Neighborhoods
✓ No Delays
Built Into Your Timeline
🗓️ Weekly Updates
Closings, Testing & Installs

A Passive System Is Only the First Step

Most new Iowa homes are now built with a passive radon-resistant system already roughed in. But a passive system alone doesn't guarantee a safe result — it needs to actually be tested, and a fan needs to be added whenever the test shows it's necessary.

We partner with builders to handle that whole process, worked into your existing construction schedule instead of creating a new bottleneck.

Ahead of the Curve on Iowa's New Radon Law

Signed by Governor Reynolds, effective July 1, 2026

Iowa's new law requires passive radon-resistant construction techniques in new homes — it doesn't yet require testing those systems, though some counties are already starting to. We can be your partner for the whole process, testing and activating systems as needed, so you're covered no matter which way local requirements move.

A Partner, Not Just a Vendor

  • Passive system testing built into your existing construction schedule
  • Fans installed only when a home's test results call for one
  • Proven process already trusted by established Iowa builders
  • Weekly status log covering closings, assessments, testing, and fan installs across your active homes

Trusted by Established Iowa Builders

We work with builders across the Des Moines metro on active neighborhoods, and we're happy to share references on request — just ask when you reach out below.

How We Work With Your Team

Built to fit into your schedule, not compete with it.

1

Coordinate

We schedule testing around your build timeline, not the other way around.

2

Test

We test the passive system once the home is ready.

3

Activate if needed

If results call for it, we install a fan to activate the system.

4

Report

You get a weekly status log tracking every home in progress.

Partner with us on your builds

Tell us about your team and building schedule and we'll follow up within 24 hours.